MENU

Construction and commissioning, cement factory, El Kebira

Algeria
Setif
Mining and Steelwork
Since 2014

ENERJIA is involved in the construction and commissioning of a complete cement line in northern Algeria.

Commissioning, Biomass plant

France
Roussillon
Water & Environment
2017

ENERJIA is involved in the commissioning and training of personnel on a biomass plant (wood and hazardous products from paper mills).

Mise en service, usine Biomasse

France
Roussillon
2017

ENERJIA participe à la mise en service et la formation du personnel sur une usine biomasse (bois et produits dangereux issus de papeterie).

Construction and commissioning, mineral water production unit

Saudi Arabia
Sibco
Water & Environment
2016

ENERJIA is involved in the construction and commissioning of a mineral water production line.

Construction, drinking water plant, Fatick and Koungheul

Senegal
Fatick
Water & Environment

ENERJIA is participating in the project to build drinking water plants in Fatick and Koungheul in Senegal.

Construction desalination plant seawater

Bahrain
Al Dur
Water & Environment

ENERJIA is involved in the project to build a new reverse osmosis seawater desalination plant.

The Al Dur desalination plant is part of a larger BOO (Build Own Operate) project contracted by Al Dur Power and Water Company (ADPWC) with the Engie / GIC consortium, combining power generation (central gas generating 1,234 MW) and desalination of seawater by reverse osmosis.

Waste incineration plant maintenance

France
Sisteron
Water & Environment
Since 2017

ENERJIA is involved in a project for the maintenance of an Incineration of Hazardous Waste and Pharmaceuticals with Energetic Revaluation.

Construction and commissioning, water production unit

Algeria
Bouglez
Water & Environment
2016

ENERJIA is involved in the construction and commissioning of a mineral water production line.

Construction, composting plant

France
Saint-Christophe-du-Ligneron
2011

ENERJIA is involved in the construction of the waste treatment plant.

The storage site was created with the aim of protecting its environment by putting in place a set of measures to ensure the tightness of the storage.

Construction, commissioning, WAMA, power plant, Kamsar

Guinea
Conakry
Energy
2016-2017

ENERJIA is involved in the construction of a Diesel Power Plant on a mine site and is in charge of the site and the commissioning of the facilities.

Construction, seawater desalination unit

United Arab Emirates
Fujairah
Water & Environment

ENERJIA is participating in the project to build a new desalination plant in the Emirate of Fujairah.

This plant will produce 590,000 m3 / day of desalinated water to meet the growing water needs of the population and enhance the development potential of this region.

Construction, anaerobic digestion plant

France
FOS on sea
Water & Environment
2016

ENERJIA is helping to rebuild the Fos sur Mer biogas plant.

Modernization installation, Waste water treatment plant

Belgium
Brussels
Water & Environment
2014-2015

ENERJIA is involved in the modernization project of the existing facilities on the Brussels wastewater treatment plant, using MBR (Membrane Bioreactor) technology.

The filtration membrane must be able to meet new treatment requirements, ie one third of the waste water of the 400,000 inhabitants of Brussels.

Process optimization, incineration treatment plant

Russian Federation
Saint PETERSBOURG
Water & Environment
2010

Sludge incineration treatment project.

These projects aim to reduce the production of sludge upstream of the water treatment system. For the sludge remaining after recovery, it is a question of minimizing the weight and the volume and of eliminating the harmful substances before their removal. These sustainable treatment solutions meet the highest standards for the protection of health and the environment.

Construction, commissioning, AMOA, electric power plant, Loulo-Gounkoto

Mali
Loulo
Energy
2016

ENERJIA is involved in the construction of a Diesel Power Plant on a mine site and is in charge of the site and the commissioning of the facilities.

Engineering and installation on FPSO, offshore oil, GirRi

Angola
Luanda
Oil & Gas / Petrochemical
Since 2014

The GiRi 2 project consists of the supply of equipment, construction and commissioning (EPIC) of the second phase of the development project Girassol Resources Initiatives (GirRI). This field is located 210 kilometers off Angola at a water depth of 1,300 meters.

Enerjia participates in project management, engineering, manufacturing and installation of:

  • 21 kilometers of umbilicals,

  • 13 kilometers of electrical interconnection cable between Dalia and Girassol floating production, storage and offloading (FPSO) units, both delivered by Technip,

  • the recovery and removal of four rigid spools,

  • the installation of eight new flexible spools.

Manufacturing monitoring, FPSO, West Hub Project

Angola
Luanda
Oil & Gas / Petrochemical
2014-2016

The field is located about 350 kilometers north of Luanda, at a water depth of 450-600 meters.

ENERJIA is involved in the management of the project and the manufacturing of about 15 kilometers of static and dynamic steel umbilicals.

HSE, QAQC, works supervision, Offshore Petroleum Platform, Sèmè-Kpodji

Benin
Ouémé
Oil & Gas / Petrochemical
2013-2015

Enerjia intervenes with its client in charge of the realization of:

  • 3 underwater lines (2 x 8 '' + 1 x 20 ''),
  • PLEM,
  • CBM
  • and the installation of topisdes of an oil platform.

Exploitation and optimization, cement plants, Mfamosing 2 Expansion project

Nigeria
Calabar
Mining and Steelwork
2016

Enerjia is involved in the construction and operation of cement plants in Nigeria.

Its experts aim to optimize cement production, improve the productivity of factories to ensure the country's demand for cement.

Supervision and AMOA QAQC, offshore wind turbine station, Project P34

Spain
Bilbao
Energy
2017
  • Supervise the construction of metal sub-assemblies for the foundation of an offshore electrical substation (offshore wind turbine).

  • Provide customer representation to supplier, customer and on-site classification teams.

  • Provide QA / QC activities for the construction of metal subassemblies of the P34 Foundation.

  • Provide customer representation to supplier, customer and on-site classification teams.

  • Manage QA / QC activities.

Construction, commissioning, WAMA, power plant, Tongon

Côte d'Ivoire
Abidjan
Energy
2016

Enerjia is involved in the construction of a Diesel Power Plant on a mine site and is in charge of the site and the commissioning of the facilities.

 

 

 

Works planning and supervision, AMOA, Mavuzi and Chicamba dams

Mozambique
Beira
Energy
2016-2017

ENERJIA participates in the rehabilitation of Hydroelectric Power Station on two dams: Mavuzi and Chicamba

  • Management of the start-up of the rehabilitation of a hydraulic power station.

  • Scheduling of commissioning work, tests and inspections.

  • Supervision and coordination of the project team during the start-up and test phases until the delivery of the plant.

Construction site monitoring, desalination plant, mining sector

Chile
Escondida
Mining and Steelwork
2014-2015

ENERJIA is involved in the construction of seawater intake and discharge pipes for a desalination plant for the mining industry.

  • 2 water intake pipes built by micro tunnel and each terminated by a GRP chimney installed in a sea receiving well (Dia.7m, Prof.11m). Each well at sea is surmounted by a concrete suction head weighing 450 tons.

  • Length 530m each, inside diameter: 2m

  • 1 discharge pipes built by micro-tunnel and terminated by a GRP chimney installed in a reception well at sea (Dia.7m, Prof.11m). The offshore well is surmounted by a concrete transition piece that is connected to 2 multi-port HDPE diffuser with an outer diameter of 1600mm and a length of 90m each.

  • Length 350m each, inside diameter: 2m

Exploitation and optimization, cement plants, Ewekoro Plant

Nigeria
Lagos
Mining and Steelwork
2013-2016

ENERJIA is involved in the construction and operation of cement plants in Nigeria.

Its experts aim to optimize cement production, improve the productivity of factories to ensure the country's demand for cement

ENERJIA headquarter

France
Toulouse
Oil & Gas, Water & Environment, Transportation, Naval, Mining and Steelwork, Energy, Oil & Gas / Petrochemical
Since 2008

Registered office ENERJIA SAS, commercial, technical, financial and administrative department.

Installation de Gazoduc en Turquie

Republic of the Congo
Ankara
Oil & Gas / Petrochemical
2011

ENERJIA is actively involved in the Moho Nord project, an exploration-production project launched off the coast of Congo in March 2013. A major investment that makes it the largest oil project ever carried out in the Republic of Congo. This project will produce 140,000 barrels of oil each day, with water depths ranging from 450 to 1,200 meters. In total, no less than 28 subsea wells will be connected to the two Floating Production Units (FPUs), to which will be added 17 wells developed from a TLP Tension Leg Platform. ).

The facilities of the new Moho North project have been designed to have a limited impact on the environment:

  • energetic efficiency,

  • zero flaring of gas under normal operating conditions,

  • treatment and reinjection of all production water.

Etude Hydro-électrique

Angola
Washington
Oil & Gas / Petrochemical
2014

Kaombo is the very first deep offshore project in Block 32 off Angola. Its reserves are estimated at 660 million barrels, distributed in deposits distant from each other, at a water depth of up to 1,950 meters.

Reaching water depths of 1,400 to 1,950 m, Kaombo is a very deep offshore project. Its goal: to develop oil deposits scattered southeast of block 32, six fields spread over 800 km2. The latter will be connected by 300 km of submarine pipelines to two floating production, storage and offloading units (FPSOs, Floating Production, Storage and Offloading). The FPSOs will be built from two crude oil tankers.

The two FPSO units will process and store production at 115,000 barrels per day each. Enerjia brings its experience in Angola and its expertise in the development of deep offshore projects to its clients involved in this project.

Installation and supervision of subsea, FPSO, offshore, CLOV equipment

Angola
Luanda
Oil & Gas / Petrochemical
2016

CLOV connects 34 subsea wells between 1,100 and 1,400 meters of water depth connected to a Floating Production, Storage and Offloading (FPSO) floating unit. Two types of oil - one more viscous than the other - are extracted simultaneously. Large as three football fields, the floating unit is capable of storing 1.8 million barrels of oil.

CLOV, is also an international project whose equipment has been manufactured in South Korea, China, Singapore, Scotland, Norway, the Netherlands, United States, France and Angola.

CLOV started its oil production in June 2014, in accordance with the initial schedule, before reaching its production plateau in September 2014. Enerjia contributed in particular its expertise in the installation of subsea equipment and in the supervision of the operations at sea. .